Home/Built for/Gas
Gas utilities
Gas meter work,
set up your way.
Gas meter exchanges, turn-ons and leak checks run on the same app and stages as water and power. Add your gas fields and steps without code.
How it works
Your gas steps,
no code.
Gas projects use the same building blocks as water and power.
Gas fields in minutes
Add fields such as access notes, regulator serials or leak check results, and choose where they show.
- Name, label and type for each field
- Limit a field to certain job types
- Make it mandatory, or visible only when a rule matches

Safety checklist first
Use a checklist group so crews confirm the site is safe before work starts, the way power projects do.
- Area secured, hazards reviewed, isolation applied
- Technician signature and sign-off time
- SOS closing with the crew's GPS location


Meter exchanges with checks
The project decides which fields appear at each stage, grouped step by step.
- Account and meter details pre-filled
- Barcode scan for meter numbers
- Last-4-digit meter check before submit

Access problems on record
When a job cannot be done, the crew says why and moves on.
- Reasons like No access, Dog / animal or Unsafe site
- Add a photo and a note
- Managers are notified right away


Assign many jobs at once
Select jobs in the list and set the technician, stage or planned date for all of them.
- Multi-select in the job list
- Technician, stage and planned date in one go
- The same from the manager app

Nothing completes without QC
Turn on the QC approval flow for a project and every job passes QC Approved or QC Rejected before Completed.
- One switch per project
- Approve, reject or reassign
- Every decision logged on the job

Built for every utility
One platform.
Every utility.
Water, power, gas and renewable energy projects run on the same app and the same stages, each with its own fields.
