Home/Resources/Guide to smart metering

Guide

Smart meter deployment,
step by step.

A practical guide for utilities and contractors running smart meter (AMI) exchange projects: from the route list to the approved report.

Smart meter sending its reading, next to a phone with a finished meter exchange checklist
Step 01

Plan the rollout

Start with scope: which meters, which areas and which crews. Agree with the utility on the job stages, the photos and readings each exchange needs, and the report they expect at the end.

  • Define job stages, including QC
  • List the fields and photos each exchange needs
  • Agree on the final report format
A meter replacement project with its job stages
Step 02

Prepare the job data

Meter rollouts start from a spreadsheet of accounts and addresses. Clean it before it reaches the field: duplicates and missing dates are the most common causes of wasted trips.

  • Import the job and meter (asset) lists from Excel
  • Catch duplicates and missing dates before import
  • Split account numbers into segments for routes
Account number segments on the project
Step 03

Schedule and dispatch

Assign technicians and planned dates in batches by route, and let each crew see only their own work.

  • Assign technicians, stages and dates in bulk
  • Notify technicians when jobs are assigned
  • Group jobs by stage to see what is left
Assigning a technician to selected jobs
Step 04

Work in the field

Each exchange follows the same steps: old meter read and photo, new meter number with a check, then the after photo. When a site cannot be accessed, the crew records why instead of leaving a blank.

  • Step-by-step forms with only the needed fields
  • Check new meter numbers before submit
  • Skip with a reason, photo and note
Meter exchange form with meter number and barcode scan
Step 05

Check quality before closing

Review photos and readings before a job counts as done. Rejected jobs go back to a crew, approved ones move to Completed.

  • Turn on the QC approval flow
  • Approve, reject or reassign
  • Keep every decision on the job history
Job record with QC stages
Step 06

Report and close out

Give the utility the report it asked for, in its field order, and keep the full record for audits.

  • Choose report fields and their order
  • Include readings and photo fields
  • Share project status with the customer
Dynamic report fields

Checklist

Before you start the rollout

  1. Plan the rollout
  2. Prepare the job data
  3. Schedule and dispatch
  4. Work in the field
  5. Check quality before closing
  6. Report and close out